When a house runs out of room, going up is often the way to get it without giving up the garden. A second storey or first-floor addition can add the bedrooms, the bathroom and the breathing space, and leave the home and the street you already love as they are.
Whether you can, and how much, comes down to the controls on your particular block. That's where we start assessing what you can and can't do.

What decides whether you can build up
Often you can, but there are a great many things to weigh up, and they're different for every house and every block.
- Budget comes first, because building up costs more per square metre than building at ground level. A lot of the square-metre rates advertised online are just plain wrong and leave people with false hope, so you need a healthy budget allowance from the start
- The structure of the existing house. Most older masonry houses, including many heritage homes, are generally fine, but you can't load concrete construction onto 120-year-old sandstone footings. An engineer needs to confirm how much the house can carry
- The approval pathway. The height limit, floor space ratio, setbacks and heritage all feed into it. A Complying Development Certificate (CDC) is generally the more certain route, but a Development Application (DA) allows for options that don't quite fit the CDC checklist
- Heritage. On a heritage house, or in a heritage conservation area, the upper floor is usually kept to the rear, behind the existing roofline, so the original roof still reads from the street
- Your neighbours. Privacy is a double-edged sword: what protects your neighbours' privacy also protects yours
- Noise. Aircraft noise, a railway corridor or a busy road should all be assessed
The extra cost often makes sense, though. Some families value their garden and don't want to give up more of it to the house, so going up preserves the ground. Some have a view to gain, of the ocean, the city, the hills or the mountains. Others want physical separation, such as a parents' retreat upstairs, away from the children's bedrooms.
Want to have a chat? Call Greg on 0412 013 627.
It starts with the stair
Working out where the stair should go on the ground floor, and how it meets the plan of the new upper floor, is where our skills are of particular value to clients.
A stair can do far more than get you upstairs. We use the stairwell to ventilate the house, to bring natural light deep into the middle of the floor plan, to provide storage beneath, to separate two parts of the house, and to be a space worth celebrating in its own right.
Stairs and steps have always had a kind of social currency. We remember the staircase in the von Trapp house in The Sound of Music and the steps Rocky ran up in Philadelphia. We meet each other on the Town Hall steps in the city, and visitors gather on the Spanish Steps in Rome. Steps and staircases anchor and orient us in a building, as well as moving us through it.
In some houses the stair has to be compact and have everything thrown at it, with storage, the laundry, a bathroom or a light well fitted under and around it. At other times, when we can let it free a little, it benefits the whole floor plan.
What happens to the rooms underneath? A stair takes a lot of space out of a floor plan, and the difficult question is often which spaces you're willing to sacrifice to make room for it. Once we've worked out where the stair will go, we can turn the question around and ask how to get the most out of the space underneath it. In the Inner West, where space is tight and land is expensive, we want every part of the plan working. At other times, though, it's lovely to have a stairwell that holds nothing else but the stair.


Homes that went up


Lilyfield. Going up gave them a private retreat among the treetops without giving up any of the garden they love. See the Lilyfield project.
Hurlstone Park. Building beside the house rather than on top of it gave the family a private main suite and a garden-level living room, without asking the old footings to carry any extra load. See the Hurlstone Park project.
Dulwich Hill. Rebuilding and going up gave a young family a flexible home on a block of under 130 m², and a very solid return when they sold. See the Lewisham Street project.
Also in Dulwich Hill. Working with the slope gave the family living spaces that open straight onto the garden, and a main suite with views on a level of its own.
Clovelly. Going up gave the family a main suite with coast views and let the kitchen and living areas move to the front, into the sun and the view.
Erskineville. Going up gave a young family three bedrooms upstairs and a ground floor given over to living, opening onto the garden and its beautiful jacaranda.
Rose Bay. Going up gave a professional musician a dedicated, acoustically refined studio for practice and teaching, separate from family life below.
Fully detailed drawings, so the build is priced properly
A second storey has more unknowns than most building work. The old house has to carry the new floor, the stair has to be threaded through rooms you already live in, and for a while the roof comes off. Where the drawings leave any of that vague, a builder has to price the gaps as risk rather than pricing the actual work, and you end up paying for that guesswork twice — once in the original quote, and then again in variations.
The drawings you get are detailed enough that a builder can price them properly and work from them, down to how the new floor meets the old house. That makes tenders worth comparing, and it means you know the real cost before you commit. Karmatecture is a fixed-fee building design practice — we work to keep budget in control.
Find out what your block allows first
It usually starts with a phone call. No charge and no obligation — just a conversation about your home and whether it's the sort of thing we'd be able to help you with. If it is, Greg will make a time to come out and look at the property with you.
Would you rather start with something concrete? The Exploration Package is a fixed-fee $795 report on what your property will actually allow: the height limit, floor space ratio and setbacks for your block, the approval pathway, concept sketches and indicative budget guidance.
FAQs - Second storey additions
Q01Can I add a second storey to my house?
Often you can, but there are a great many things to weigh up, and they're different for every house and every block.
The planning rules come first. Setbacks change with the width of the block, so a narrow lot can leave less room to build up than people expect. If the work goes through as a Development Application, you'll also need to show how the new storey shadows the neighbours' living areas, such as their kitchens, lounge rooms and dining spaces. This isn't required for a Complying Development Certificate. In areas affected by aircraft noise, an addition will normally be a DA and will need an acoustic engineer's input.
Then there's the house itself. An engineer has to confirm that the existing structure is adequate to carry a second storey, and the stair takes up more room than most people think.
The numbers have to stack up as well, from floor space ratio to site coverage. Building up also costs more per square metre than building at ground level, so it's worth asking whether the space you need could be found on the existing ground floor instead.
Probably the most important question of all is whether you've considered, and arrived at, a sensible budget for the work. Working through all of this before any design starts is what our Exploration Package is for.
Q02Can I put a second storey on a heritage house?
The simple answer is yes, though occasionally it's no. It's a complicated question, and one we're asked all the time.
It's very possible. We currently have two homes under construction that are both in heritage conservation areas. One of them is also a listed heritage item, and part of that house is going to two storeys.
There are limits. The higher a house sits on the scale of heritage protection, the tighter the opportunities become, and the more creative we have to be about how the project moves forward. It can be done; it just takes more finesse, and someone with experience. I've been doing this for a long time in this area, and I have a good understanding of heritage homes, their particular foibles and what the planning authorities require. Even so, it's never cut and dried.
In a heritage conservation area, council may want the new upper floor kept to the rear, in the secondary roof area, so the original roof still reads from the street.
For any house in a heritage conservation area, or a listed heritage item, we always take our initial scheme — the one we think will be the preferred option — to a formal pre-DA meeting with council's heritage planning staff before going further.
Q03Do I need a DA, or can it be a CDC?
A Complying Development Certificate (CDC) is assessed under the NSW Housing Code, which is a compliance code. Your proposal is measured against a long list of numerical checks, and those numbers vary with the width of the block, the setbacks and other factors, so every site needs to be assessed to see whether a CDC is possible at all.
Sometimes you want something that falls outside that checklist, such as a different wall height or a variation to a setback. Then the project goes through as a Development Application (DA) instead.
Many people assume a CDC is much quicker. In practice, from the start of design to approval, the two pathways usually end up within a couple of weeks of each other, so timing isn't really the deciding factor. What a CDC gives you is more certainty: if the work ticks every box, it can be approved.
Often, though, the site itself decides it. There are a number of local environmental plan and site conditions that can push a project from the CDC pathway into a DA, including:
- a heritage item, or a house in a heritage conservation area
- flood-affected land
- land affected by aircraft noise (an ANEF zone) or another acoustically compromised area
- contaminated land
- a biodiversity area, or possible impacts on critical habitat
- a foreshore or scenic protection area.
Q04Can we stay in the house while it's built?
It's a question I'm asked all the time, because alternative accommodation is one of the significant costs of renovating.
You'll want to move out for any reasonably sized renovation. Most projects involve work on the kitchen and bathrooms, so at various times the electricity, water and gas will be cut off. You don't want to be sharing the builder's site toilet, and the builder doesn't want you to either.
Time. How long the roof is off depends on the size of the project, but you could be looking at four months or more before the house reaches lock-up and the roof is back on. Even then, the builders are glad to have a platform from which they can start the fit-out, store materials and work inside. Just because it has a roof on it doesn't mean it's somewhere you should be.
The build. When you're not there, the builder has far more freedom to get on with the work. They can make a mess and raise dust without feeling they have to tiptoe around you, and having the family in the house causes a lot of anxiety on both sides.
Noise. Some clients tell me they can put up with the noise. That lasts until they've been woken at 6:45 am by the trades arriving and heard the first drop saw start at 7 am. If you're living in the house, it gets tiring.
The legal side. When the builder takes possession of the site, you're handing the house over to them, almost like a lease, and they become responsible for what happens there. Their insurances generally won't cover you or your children if you're hurt on an incomplete construction site, and a house mid-construction isn't very habitable, or very pleasant, anyway.
Exceptions. We once had a client whose child was on the autism spectrum and didn't cope well with big changes. Having the home renovated was change enough, and moving out might have been one step too far. So the builder set up a temporary kitchen in the living room, reusing the family's old kitchen, while the work carried on at the rear, largely separated from the rest of the house. The builder stepped well outside their normal way of working to make that possible for a family in an extraordinary situation, and it's the exception rather than the rule.
Q05Can my existing house carry a second storey?
Most additions are to homes that have been standing for many years. In the Inner West of Sydney it isn't unusual for a second storey to be proposed on a building up to 140 years old. These houses weren't built to modern standards, and in general we don't really know what their footings are, except that they're certainly not the concrete and steel footings we build today.
So before a second storey can go ahead, the house has to be assessed by a structural engineer. The engineer looks at the existing structure and what it's made of, since brick has a greater bearing capacity than timber, for example. They also look at the bearing capacity of the soil under the footings, and at drainage, because poor drainage can scour soil out from underneath them. If the house is timber framed, possible insect damage becomes a structural question too.
Older doesn't always mean weaker. We're looking at a project at the moment on a post-World War II war service home. Because of shortages of other building materials at the time, houses like this were generally framed in Australian native hardwoods, which makes the frames very resilient, strong and tough, with a high bearing capacity that can often take a second storey well. It still needs an engineer to confirm it.
As for when, with a second storey we always get the engineer involved before the design goes too far.
Q06Is it better to go up or to extend out the back?
If you can extend out the back on a single level, or close to it, there are real benefits. Access is much easier for anyone in the household with limited mobility, including older family members, and the cost per square metre of construction is generally much lower. A ground floor addition can also reach out into different parts of the garden, picking up different views and opening up new possibilities for the way the ground floor works.
There are good reasons to go up instead. Your garden may not be large enough to build out on a single level, or you may want to keep the garden you have. You may want a private bedroom suite away from the children. There may be a beautiful view or a local landmark you could enjoy from upstairs. And more and more, new apartment buildings and existing trees overshadow parts of the ground floor; building a second storey lifts you above them and gives you back sun and views.
Helping someone decide comes down to the site, what the family needs, what the brief is, and the budget. Imagine, for example, that going up to open up a view would add twice as much to the value of the house as it costs to build, and you get to enjoy the view as well. That's an investment worth taking very seriously.
Sometimes the existing building makes the choice for you. If the structure can't take a second storey, the only option is a separate addition on the ground floor.
Q07How long does it take?
From the first call to builders on site usually takes eight to 18 months. Where your project lands in that range depends on a number of things, and only some of them are in our hands:
- the design itself, and how much time you're able to give to meetings and decisions along the way
- how quickly each stage is signed off and paid for, so the next one can start
- preparation of fully detailed drawings
- input from the other consultants the project needs, such as the structural engineer and the surveyor
- the approval pathway. A second storey that can go through as a CDC is certainly achievable well within the 18 months. It becomes harder to commit to a timeframe when there are planning considerations that need more thought and more input from council, such as a DA for a heritage house
- interviewing builders, and waiting for their quotes
- how soon the builder you choose can start.
Q08What will a second storey cost?
Honestly, the best time to build was five years ago. There have been significant cost pressures since then. COVID changed the whole demand landscape, and global financial pressures have added inflation on top.
Will costs come down? In my view they've certainly stabilised. There's potential for them to come down, but I wouldn't be holding my breath.
Apart from the cost of the building itself, there's the opportunity cost of not building. Say you're a couple with young children, considering a major renovation, and you decide to put it off for five years. In five years' time your five-year-old is 10 and your seven-year-old is 12, so the time they'll actually spend in the home and enjoy it is shorter. From a family's point of view, the best time to do it is usually now. Clients often tell me it will be more of a stretch for them at this stage, but with careful planning, if you can prioritise doing it earlier in your life, you'll enjoy the benefits for longer.
There's another kind of opportunity, too. If you've gone to the trouble and expense of renovating now, you've also realised much more of your property's potential. So if your circumstances change, whether that's a job offer overseas or a decision to throw it all in for the beach at Byron Bay or a backpack through India, you're in a strong position to sell the house for its best value. That gives you an incredible amount of flexibility.